The Hanseatic League in Europe

Content

Building Blog

Piece by piece the unique theme world “THE HANSEATIC LEAGUE in EUROPE” is gaining shape at HANSA-PARK. Comprehensive earth works, huge foundations – the building team is facing enormous challenges because the awe-inspiring theme world is setting new standards. Come and join us watching the progress at the construction site!


02.04.2012

28.03.2012

28.03.2012

28.03.2012

On top of the roofs with a view of Novgorod

26.03.2012

The 5th phase of our “THE HANSEATIC LEAGUE in EUROPE” theme world, not fully completed yet

26.03.2012

Details in Bergen

26.03.2012

Ribe and Bergen

26.03.2012

Timber framing in Ribe

26.03.2012

A view of London

26.03.2012

The roof is being tiled

09.03.2012

A London chimney

09.03.2012

Details of Ribe

09.03.2012

Designing the Hanseatic arcades near the group box offices

09.03.2012

Transition from Lübeck to London

09.03.2012

Theming is progressing

07.03.2012

Fitting the first semi-circular arch with brick slips

07.03.2012

The roof is being tiled

13.02.2012

The roof tiles are ready

13.02.2012

A view from far away

01.02.2012

Despite freezing temperatures work continues

01.02.2012

A fresh view from the top

20.01.2012

The roofs are being sealed off

20.01.2012

The weather is kind to us

13.01.2012

Progress is fast...

13.01.2012

After Ribe comes Bergen

11.01.2012

Ribe

11.01.2012

Piece by piece “THE HANSEATIC LEAGUE in EUROPE” theme world is growing

06.01.2012

The building shells are gaining shape

04.01.2012

London is coming up

03.01.2012

Precision work

02.01.2012

The first part of London is up

02.01.2012

The big crane has its field day

02.01.2012

Construction site ahead!

21.12.2011

A view from the top

21.12.2011

Ready for the concrete to arrive

20.12.2011

The holes for the foundation have been excavated

15.12.2011

The cobbles have been laid

31.12.2011

Cables are exposed

31.12.2011

The windows are being protected with chipboards

31.12.2011

Work started

13.12.2011

The projecting roof has already been dismantled

07.11.2011

What will this building look like in 5 months?

07.11.2011

Start of the 5th construction phase

07.11.2011

20.06.2011

20.06.2011

20.06.2011

22.06.2011

19.06.2011

18.06.2011

18.06.2011

18.06.2011

18.06.2011

18.06.2011

18.06.2011

18.06.2011

18.06.2011

17.06.2011

17.06.2011

17.06.2011

17.06.2011

17.06.2011

17.06.2011

Bruges IV

13.06.2011

Bruges IV

13.06.2011

The Hanseatic League at HANSA-PARK

13.06.2011

Bruges IV

13.06.2011

10.06.2011

10.06.2011

Details of Bruges IV

10.06.2011

The veils are off at Bruges IV

10.06.2011

05.06.2011

Paris is taking shape

05.06.2011

Groningen & Paris

05.06.2011

Groningen is growing

05.06.2011

Bruges

05.06.2011

The sundial indicates the time

30.05.2011

Bruges is getting the final touches

30.05.2011

Buildings from Paris

30.05.2011

The first archways have almost been completed

18.05.2011

Stone upon stone

18.05.2011

A vault in Paris

06.05.2011

Archways at the arcades

06.05.2011

Details at Bruges

06.05.2011

Rooftop sceneries I

06.05.2011

Rooftop sceneries II

06.05.2011

Don’t worry - we’ll keep on looking behind “the scenes” for you

26.03.2011

Fine-tuning starts

18.03.2011

Edifices up to 14m high

12.03.2011

The world of the Hanseatic League touched by the morning sun

12.03.2011

View through the arcades

10.03.2011

A new roof for the escalator

10.03.2011

The new city is coming up

09.03.2011

Groningen

09.03.2011

Paris is rising

09.03.2011

The fourth construction phase is gaining shape

07.03.2011

Bruges is expanding

04.03.2011

The sub-construction is getting bigger

03.03.2011

A new face for the HANSA-PARK shop

25.02.2011

The workers are busy on both sides

25.02.2011

You can already get an idea of how the place will look like in a few months!

18.02.2011

The 4th building in Bruges is rising

18.02.2011

Bruges is being erected

17.02.2011

The first precast concrete elements have been delivered

16.02.2011

The layout is visible - all is ready for the walls to come

11.02.2011

Old foundations are being removed

03.02.2011

... and poured.

01.02.2011

... reinforced...

07.02.2011

Then large foundations for the high buildings are being laid, ...

02.02.2011

Construction of the 4th phase started: disassembling of the projecting roofs

01.02.2011

New atmosphere at the entrance area

21.05.2010

Bruges at HANSA-PARK

21.05.2010

… and off they go

21.05.2010

The covers will soon come off

21.05.2010

Before the ceremony

21.05.2010

The next morning everything is covered again

21.05.2010

Last act for the day: installing the stair railing

20.05.2010

Preparations last way into the evening

20.05.2010

Hamburg

20.05.2010

First glimpse of the completed buildings

20.05.2010

The covers and scaffolding are being dismounted

20.05.2010

The covers will soon be removed

20.05.2010

Construction site atmosphere in the evening hours

20.05.2010

The painted tarpaulins are still covering the facades

Details in Hamburg

10.05.2010

Arched gateway in Bruges – still a shell construction

10.05.2010

The “Krameramtsstuben” in Hamburg

10.05.2010

Timber framing in Hamburg

10.05.2010

Doors in Bruges

10.05.2010

External building facades in Bruges

10.05.2010

Theming of the arcades

10.05.2010

Belgian charm at HANSA-PARK

10.05.2010

Due to the harsh winter, the houses had to remain veiled

10.05.2010

Roof works

14.04.2010

Details on the facades

19.03.2010

External theming of the entrance to the service building

11.03.2010

Nothing goes without roofs

08.03.2010

Theming of the arcades

08.03.2010

Bruges

23.02.2010

The roofs begin to take shape

19.02.2010

Support for the arcades

12.02.2010

Work underway - wherever you look

08.02.2010

The building’s front on the Fun & Sweet side

25.01.2010

The entrance to the Service Centre

25.01.2010

Rostock

25.01.2010

But even snow doesn’t stop us... building works continue!

13.01.2010

A view from above

13.01.2010

Crane and excavator are "hibernating"

10.01.2010

Snow, snow and more snow...

23.12.2009

Lübeck and Rostock still need support

23.12.2009

Snow delays the progress of the work

23.12.2009

View of the construction work

15.12.2009

The Hanseatic section of Lübeck with the ground walls

15.12.2009

Watchful eye: the site manager on inspection patrol

14.12.2009

Accuracy is crucial

14.12.2009

The first pre-fabricated parts are being delivered

14.12.2009

... and erected

14.12.2009

The crane is moving in

14.12.2009

Site consultation meeting

11.12.2009

Large construction vehicles on a mission

08.12.2009

The foundations have been poured

04.12.2009

The entire entrance area – a huge construction site

01.12.2009

In front of the cafeteria

01.12.2009

Earth works at the entrance area

25.11.2009

The Holstentor in its full splendour

26.04.2008

Ceremonial unveiling of the Holstentor

26.04.2008

Ceremonial unveiling of the Holstentor

26.04.2008

Ceremonial unveiling of the Holstentor

26.04.2008

Ceremonial unveiling of the Holstentor

26.04.2008

Festive moment

20.12.2007

Very soon, nothing is left of the old entrance

October 2007

The old entrance is history now

October 2007